Installation Complete: Cross Lake Roll-Off Load Out Facility in Backus, Minnesota
72' x 126' Apex Series from Britespan Building Systems
The GC Fabric Building Division completed a load out facility in Backus, Minnesota. Cross Lake Roll off was built to satisfy Minnesota Pollution Control (MPCA) construction demolish material sort requirements for a material before it reaches the landfills.
The building features an excavator bay and recessed drive lane through the building for load out. Three sidewall openings and and an extended 14' clearance height will allow semi trucks to pass through, which will assist in operations.
Scope of Work
-
72' x 126' Apex Series Building from Britespan
-
Engineered Building per IBC for Project Site
-
12.5 ounce, 23 mil polyethylene Non-FR fabric
-
Hot Dipped Galvanized Building Components
-
Extended 14' Leg Height
-
4' Poured Wall Foundations
-
One Open End Wall
-
One End Wall with Steel Framing
-
Four 3'x 3' Mesh End Wall Vents
-
Four Sidewall Portal Frames Open to 13'-10"
Building Specs

-
Location: Backus, Minnesota
-
Size: 72' x 126'
-
Year: 2024
-